Coordinating material and spare parts delivery with construction schedules
In the UK, 95% of construction projects reported delays in 2024, pushing costs up by 20-30%. Accurate coordination of material deliveries is essential to keep projects on schedule, control costs, and ensure every team has what it needs, exactly when they need it. Early deliveries create site congestion, while late deliveries can halt work, delay project phases, and increase expenses. While on-time deliveries can’t prevent all delays, aligning materials with construction schedules helps minimise disruption and keeps projects moving efficiently.

Why delivery coordination matters
Construction projects involve many stakeholders, trades, and sequential tasks. This makes timing deliveries critical, especially for materials that affect downstream work. If deliveries are not synchronised with the construction schedule, delays, miscommunication, or supply shortages can disrupt progress and increase the risk of cost overruns.
Due to the many other factors that cause delays in construction projects, you need a supply chain that can move quickly. Working with a partner like Carousel helps ensure that material delivery aligns with every stage of the project, keeping the site running smoothly and reducing stress for project managers.
How Carousel helps – precision logistics, aligned with your schedule
Supply‑chain planning & coordination
Carousel offers full supply‑chain coordination, taking care of procurement, warehousing, transport and delivery. We plan deliveries around your project timeline, factoring in lead times, site readiness, labour availability and storage capacity. This reduces confusion, avoids bottlenecks and keeps materials flowing to construction sites.
Final‑mile delivery: By:NIGHT, By:DAY, By:NOW and By:DEMAND
We know construction schedules shift fast. That’s why our final-mile services give you options:
- By:NIGHT – parts arrive early morning, ready for first-shift work.
- By:DAY – next‑day delivery during working hours for less urgent but still time-critical items.
- By:NOW – same‑day delivery when you need materials fast.
- By:DEMAND – ad-hoc delivery requests for emergency situations
These services help make sure that every trade gets what it needs exactly when it needs it, even on tight timelines or shifting schedules.
Real‑time tracking and full visibility
With our proprietary tracking platform, Gateway®, you always know where your materials are. From inventory management in warehouses to goods in transit, or out for delivery. This transparency helps you plan more reliably, avoid surprises, and coordinate delivery schedules and multiple teams and tasks with confidence.
Flexible warehousing & stock management
We don’t just deliver parts; we can store them, manage stock levels, and handle distribution, so you’re not overstocked and not under-supplied. Our forward stock locations mean that your materials are near at hand but not causing congestion on the site. This helps avoid delays caused by missing items or storage constraints.
Returns & reverse logistics
Construction isn’t just about delivery; Excess materials can also need returning, or faulty equipment can need maintenance or repairs by the manufacturer. Carousel’s returns management services handle this smoothly, preventing delays, clutter on site or wasted time.
Revolutionising inventory control for Liebherr GB Ltd
Liebherr’s UK branches were holding large amounts of surplus stock due to inconsistent spare parts deliveries from their European distribution centre. This stockpiling tied up capital, increased costs, and slowed after-sales service. Carousel addressed the challenge by introducing a fast, flexible final‑mile delivery solution, shifting from standard next-day delivery to overnight delivery with parts arriving by around 8 AM.
By consolidating, sorting, and distributing parts through a central warehouse, Carousel improved visibility with real-time tracking, and reduced reliance on excess stock at each branch. The results included a 20% reduction in inventory across eight UK branches, faster parts availability, lower surplus stock, and significant cost savings. Engineers now receive parts early, enabling quicker repairs and more reliable after-sales service, while Liebherr operates a leaner, more efficient, and responsive supply chain.
Creating the ideal logistics solution
Individually, our supply-chain coordination, final-mile delivery, warehousing, and returns services are powerful. Together, they create a fully connected system that adapts to the complexities of modern construction projects. By integrating planning, storage, delivery, and returns into a single, responsive operation, materials move efficiently from suppliers to construction sites, even when schedules shift or unexpected challenges arise.
Keep your project moving – partner with Carousel to align materials, schedules, and deliveries seamlessly. Contact us today for a tailored approach to your construction deliveries.